Implementation of Building Information Modelling (BIM 3D) on the Steel Building project: Case study of the 3-storey building GKJ MARGOYUDAN
Abstract
This study investigates the general form of the determinant of negative integer powers of a special class of centrosymmetric matrices of even order. For an even positive integer and a positive integer , let denote such a matrix, and consider the matrix obtained by raising to the power . To determine , we first conjecture the general form of the inverse matrix by observing the patterns in the explicit inverses , and . The conjectured form is then verified by showing that and . The resulting inverse is used to construct the matrices , and ; from these cases we infer the general structure of . The validity of this general form is established using mathematical induction. Once the matrix has been obtained, an explicit closed-form expression for is derived via the cofactor expansion method. Finally, a numerical example is presented to illustrate the application of the determinant formula.
Full Text:
PDFReferences
A. Basta, M. H. Serror, dan M. Marzouk, “A BIM-based framework for quantitative assessment of steel structure deconstructability,†Autom. Constr., vol. 111, no. October 2019, hal. 103064, 2020, doi: 10.1016/j.autcon.2019.103064.
B. Succar, “Building information modelling framework: A research and delivery foundation for industry stakeholders,†Autom. Constr., vol. 18, no. 3, hal. 357–375, 2009, doi: 10.1016/j.autcon.2008.10.003.
M. Wang, C. C. Wang, S. Sepasgozar, dan S. Zlatanova, “A Systematic Review of Digital Technology Adoption,†Build., vol. 2020, no. 10, hal. 1–29, 2020.
M. Firdaus Razali, N. Azam Haron, S. Hassim, A. Hizami Alias, A. Nahar Harun, dan A. Salihu Abubakar, “A Review: Application of Building Information Modelling (BIM) over Building Life Cycles,†IOP Conf. Ser. Earth Environ. Sci., vol. 357, no. 1, 2019, doi: 10.1088/1755-1315/357/1/012028.
K. K. D. Sungkono, “Aplikasi Building Informasi Modeling (Bim) Tekla Structure Pada Konstruksi Atap Dome Gedung Olahraga Utp Surakarta,†JUTEKS - J. Tek. Sipil, vol. 3, no. 2, hal. 273, 2019, doi: 10.32511/juteks.v3i2.278.
J. S. Lee, N. Kwon, N. H. Ham, J. J. Kim, dan Y. H. Ahn, “BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea,†Adv. Civ. Eng., vol. 2019, no. Vdc, 2019, doi: 10.1155/2019/4163625.
C. B. Tatum, J. A. Vanegas, J. M. Williams, dan U. of Texas at Austin. Construction Industry Institute, Constructability Improvement Using Prefabrication, Preassembly, and Modularization. The Institute, 1986.
M. Gerges dkk., “BIM Role within the Conceptual Design Phase: A Case Study of a UK Construction Project,†Int. J. Archit. Eng. Constr., vol. 8, no. 1, 2019, doi: 10.7492/ijaec.2019.006.
E. J. Sippel dan H. B. Blum, “Structural analysis of steel structures with non-symmetric members,†Eng. Struct., vol. 245, no. December 2020, hal. 112739, 2021, doi: 10.1016/j.engstruct.2021.112739.
S. Firoz dan S. K. Rao, “Modelling Concept of Sustainable Steel Building by Tekla Software,†Int. J. Eng. Res. Dev., vol. 1, no. 5, hal. 18–24, 2012, [Daring]. Tersedia pada: www.ijerd.com.
S. Park dan I. Kim, “BIM-Based quality control for safety issues in the design and construction phases,†Archnet-IJAR, vol. 9, no. 3, hal. 111–129, 2015, doi: 10.26687/archnet-ijar.v9i3.881.
DOI: https://doi.org/10.26877/ijosbie.v3i2.13518
Refbacks
- There are currently no refbacks.
Copyright of International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) ISSN 2716-4829 (online)
Universitas PGRI Semarang
Jl. Sidodadi Timur No. 24 - Dr. Cipto Semarang
Dr. Putri Anggi Permata S., M.T
Phone : +62 878 3229 1959
Email: putrianggi.permata2@gmail.com