FACTORS AFFECTING DELAYS IN THE CONSTRUCTION PROJECT OF 5 FLOOR PARKING BUILDING ROEMANI HOSPITAL, SEMARANG.

agra febyola lova nugraha, Busyro Lathif, Putri Anggi Permata Suwandi, Ibnu Toto Husodo

Abstract


In the planning of a project, there have to be a time schedule that can served as a guideline in the project, this shows that scheduling can influence the activity of a project. A good time schedule in a project can make project run effectively and efficiently, but in reality the actual work of a project did not always go as planned. In this case, the construction of library of UIN Sunan Ampel Surabaya.In the process of construction of library of UIN Sunan Ampel Surabaya, there is a delay that caused by a lot of factors, resulting in a delay of 49 days, the project initial duration is 154 days but the implementation duration is 203 days. Because of this, an analysis was carried out on this matter to determine what caused this lateness on project scheduleFrom the analysis that has been done the result is that the project lateness is caused in preparation work and the usage of work system with 3 shift but using the same man power. Factors of this lateness is caused by the owner, the conctractor, and weather disturbance.

Full Text:

PDF

References


Bakhtiyar, A. (2012). Analysis of Factors Affecting Delays in Building Construction Projects in Lamongan City. Civil Engineering Journal.

Foster, S. T. (2004). Managing Quality : an integrative Approach. Prentice Hall. Hasan, M.I. (2002). Main - Main Material Research Methodology and the application. Jakarta: Ghalia.

Hasibuan, M. S. (2006). Basic Management, Understanding, and Problems, Revised Edition. Jakarta: Earth Script.

Popescu, C. M., & Charoengam, C. (1995). Project Planning, Scheduling and Control in Construction. Canada: John Willey & Sons.

Tarore, H., & Mandagi, R. (2006). Project and Construction Management System (SIMPROKON). Manado: JTS Publishing Team, Faculty of Engineering, Sam Ratulangi University.




DOI: https://doi.org/10.26877/ijosbie.v4i1.16033

Refbacks

  • There are currently no refbacks.



Copyright of International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) ISSN 2716-4829 (online)

Universitas PGRI Semarang
Jl. Sidodadi Timur No. 24 - Dr. Cipto Semarang

Dr. Putri Anggi Permata S., M.T
Phone : +62 878 3229 1959
Email: [email protected]