ANALISIS FAKTOR–FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK PEMBANGUNAN GUDANG LOGISTIK POLRES LAMONGAN

Intan Mayasari, Zamaniah Zamaniah, Hendra Masvika, Citra Permatasari, Ardiana Ramadhon, Agustina Wardani

Abstract


The construction of the Lamongan Police Logistics Warehouse, as part of public infrastructure, requires efficient supervision to support police operational needs. However, several operational issues have arisen, hindering timely completion. One of the main problems is delays in material delivery, which significantly disrupt project progress. This study aims to analyze the factors influencing delays in the warehouse construction project, focusing on the roles of contractors, suppliers, consultants, and project owners. Using a quantitative approach, the research identifies both internal and external factors that contribute to construction delays. Multiple linear regression analysis was employed to examine the relationship between independent variables (work environment, material delays, equipment, labor, and design changes) and project implementation delays. The findings indicate that labor is the most influential factor, with a beta value of 0.455, followed by design changes, which have a positive though relatively minor effect. In contrast, work environment, material delays, and equipment factors show no significant impact. To mitigate delays, the study recommends strengthening coordination among stakeholders, improving resource management, and enhancing project planning. The research provides valuable insights for improving construction project management and preventing unforeseen delays in similar future projects.

Keywords


Project delay; labor; construction management

Full Text:

PDF

References


Ahmed, S. M., Azhar, S., Kappagntula, P., & Gollapudil, D. (2003). Delays in construction: a brief study of the Florida construction industry. Proceedings of the 39th Annual ASC Conference, Clemson University, Clemson, SC, 257, 66.

Ahyari, A. (1987). Untuk Mengatasi Keterlambatan Bahan Yang Terjadi Karena Pemasok Mengalami Suatu Hal. Maka Perlu Adanya Pemasok Cadangan.

Assaf et al. (1995). 2. BAB I.

Chendra, F., & Pintardi Chandra, H. (n.d.). MODEL FAKTOR-FAKTOR PENYEBAB DAN DAMPAK KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA.

Dipohusodo, I. (1996). Manajemen Proyek & Konstruksi, Jilid 1. Kanisius.

Ghozali, I. (2018). Aplikasi analisis multivariete dengan program IBM SPSS 23.

Kraiem, Z. M., & Diekmann, J. E. (1987). Concurrent delays in construction projects. Journal of Construction Engineering and Management, 113(4), 591–602.

Leonda, G. (2008). Studi Keterlambatan Penyelesaian Proyek Konstruksi Pada Tahun 2007 Di Daerah Belitung. Universitas Islam Indonesia, Yogyakarta.

Lewis, T. M., & Atherley, B. A. (2002). Analysis of construction delays. In The Organization and Management of Construction (pp. 60–71). Routledge.

Messah, Y. A., Penyebab, K., Pelaksanaan, K., Konstruksi, P., Di, G., Kupang, K., & Messah, Y. A. (2013). KAJIAN PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTUKSI GEDUNG DI KOTA KUPANG. In Jurnal Teknik Sipil: Vol. II (Issue 2).

Putra Agritama, R., Huda, M., Setiyo Rini, T., Program Studi Teknik Sipil, M., Teknik, F., Jurusan Teknik Sipil, D., & Wijaya Kusuma Surabaya ABSTRAK, U. (2018). FAKTOR-FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA (Vol. 6, Issue 1).

Putri Anggun Sari, D. F. A. rahman,. (2023). 424-Article Text-1914-1-10-20230601 (1).

sahrial. (2022). ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI.

Seputro, H., & Pratama, Y. (2022). ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PENYELESAIAN PROYEK PEMBANGUNAN GEDUNG MIPA CENTER UNIVERSITAS BRAWIJAYA MALANG (Vol. 12, Issue 2).

summary-39934795. (n.d.).




DOI: https://doi.org/10.26877/giratory.v7i1.28133

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Teknik Sipil Giratory UPGRIS

Program Studi Teknik Sipil

Fakultas Teknik dan Informatika

Universitas PGRI Semarang