PERAN PEJABAT PEMBUAT KOMITMEN SEBAGAI PENGENDALI FUNGSI DALAM PEMBANGUNAN LANJUTAN LABORATORIUM B2P2TOOT TAWANGMANGU
Abstract
This study investigates the general form of the determinant of negative integer powers of a special class of centrosymmetric matrices of even order. For an even positive integer and a positive integer , let denote such a matrix, and consider the matrix obtained by raising to the power . To determine , we first conjecture the general form of the inverse matrix by observing the patterns in the explicit inverses , and . The conjectured form is then verified by showing that and . The resulting inverse is used to construct the matrices , and ; from these cases we infer the general structure of . The validity of this general form is established using mathematical induction. Once the matrix has been obtained, an explicit closed-form expression for is derived via the cofactor expansion method. Finally, a numerical example is presented to illustrate the application of the determinant formula.
Full Text:
PDFReferences
Supriono, Lyla. 2014. Faktor-Faktor Risiko Keterlambatan Pembangunan Proyek Infrastruktur Perdesaan Berdasarkan Waktu Perencanaan (Studi Kasus : Proyek PPIP Kec. Bringin Kab. Ngawi), jurnal teknik sipil Untag Surabaya, vol. 7 no. 1, hal 63-72
Fitria, Anisa. 2017. Assessment Manajemen Risiko pada Proyek Konstruksi High Rise Building (Studi Kasus Proyek Tunjungan Plaza 6 Surabaya dan Proyek One East Residence Apartment), skripsi. Universitas Jember.
Kurniawan, Deddy. 2018. Identifikasi Faktor Risiko yang Mempengaruhi Kinerja Waktu Pelaksanaan Konstruksi Gedung Secara Swakelola (Studi Kasus : Pembangunan RKB Sekolah SD dan SMP Kota Bukittinggi), jurnal teknik, vol.1 no.2
Situmorang, B. E. et al. 2018. Analisis Risiko Pelaksanaan Pembangunan Proyek
Putri, M. N. et al. 2015 Analisis Manajemen Risiko Proyek, jurnal Universitas Andalas. hal.59–69.
Joni, I. 2012. Risiko Manajemen Proyek, jurnal ilmiah Teknik Sipil, vol. 16, hal. 48–55.
Nasrul. 2015. Manajemen Risiko Dalam Proyek Konstruksi Ditinjau Dari Sisi Manajemen Waktu’, Jurnal Momentum, vol.17, hal. 50–54.
Jaya, I Nyoman Martha, et al. 2019. Manajemen Risiko Terhadap Pelaksanaan Proyek Konstruksi Hotel di Kawasan Serbagita, jurnal spektran, vol. 7 no. 1, hal. 51-57
Ismael, I. 2013. Keterlambatan Proyek Konstruksi Gedung Faktor Penyebab dan Tindakan Pencegahannya. Jurnal Momentum, vol.14, hal. 46–56.
Lokobal, Arif. et al. 2014. Manajemen Risiko pada Perusahaan Jasa Pelaksanaan Konstruksi di Provinsi Papua (Studi Kasus di Kabupaten Sarmi), jurnal ilmiah Media Engineering, vol.4 no.2
DOI: https://doi.org/10.26877/ijosbie.v3i2.13460
Refbacks
- There are currently no refbacks.
JP3 (Jurnal Pendidikan dan Profesi Pendidik) telah terindeks pada:
JP3 (Jurnal Pendidikan dan Profesi Pendidik) by LPP Universitas PGRI Semarang is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at https://journal.upgris.ac.id/index.php/jp3.


.png)









