ANALISIS FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG AGRARIA DAN TATA RUANG BADAN PERTANAHAN BOJONEGORO TAHAP II

Annisa’ Carina, Anggitsna Mujib Rabbani, Fitria Maya Lestari, Nor Ahmad Fahrurroziqin, Khozin Gilang Ramadhan, Agung Kristiawan

Abstract


Construction project delays are a common problem in Indonesia, often resulting in increased costs, decreased quality, and disruption to project completion schedules. This study aims to analyze the factors causing delays in the Bojonegoro Land Agency's Agrarian and Spatial Planning Building Phase II project. The Critical Path Method (CPM) was used, which identifies the critical path within the project and activities that could potentially cause delays. Data were collected through documentation,  field observations, and interviews with project stakeholders. The results indicate that delays occurred due to several internal factors, such as inexperienced workers, delays in the provision  of materials  and equipment,  and  ineffective  coordination.  The project's critical path consists of a series of activities with no time leeway (float) with a total duration of 108 days. By understanding the activities on the critical path, project managers can take mitigating measures to prevent further delays. This study contributes to construction project time management and serves as a reference for future similar research.

Keywords


Project Delay; CPM; Project Management; Construction Project

Full Text:

PDF

References


Fahrul, Mokoagow, N., Maulana, R., Oggi, Adrian, H., Sely, & Sari, N. (2024). ANALISA PENERAPAN MANAJEMEN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG UNIT PELAYANAN TEKNIS PUSAT BALAI LATIHAN KERJA BANTUL. 3(1), 88–97. https://doi.org/10.55123

Lia Amelia Megawati, L. (2020). ANALISIS FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI BANGUNAN GEDUNG.

Mardiana, A., Sultan, I., Gorontalo, A., Habu, A. J., & Kunci, K. (2020). PENGARUH PEMBANGUNAN INFRASTRUKTUR TERHADAP PERTUMBUHAN EKONOMI KABUPATEN GORONTALO UTARA. In Jurnal Ekonomi Syariah IAIN Sultan Amai Gorontalo) (Vol. 1, Issue 1).

Pane, A., Latief, Y., & Riantini, L. S. (2022). Estimate Activity Duration with Resource Capacity Approach in Project Production Phase, Case Study: Pump Packaging Production System. 222, 355–366. https://doi.org/10.2991/978-94-6463-134-0_35

Qomariyah, S., & Hamzah, F. (2013). ANALISIS NETWORK PLANNING DENGAN CPM (CRITICAL PATH METHOD) DALAM RANGKA EFISIENSI WAKTU DAN BIAYA PROYEK.

Ramadhan Yundra Saputra. (2017). Analisa Faktor Penyebab Keterlambatan Penyelesaian Proyek Pembangunan Mall ABC.

Tania Edna Bhakty, S. E. S. N. C. K. S. (2018). RANCANG BANGUN TEKNIK SIPIL. Program Studi Teknik Sipil Fakultas Teknik Universitas Janabadra.

Wendi Boy, R. E. R. A. F. (2021). Jurnal RIVET (Riset dan Invensi Teknologi) FAKTOR- FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG KULIAH PADA MASA PANDEMI COVID 19. In Universitas Dharma Andalas (Vol. 01, Issue 1).




DOI: https://doi.org/10.26877/giratory.v7i1.28131

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Teknik Sipil Giratory UPGRIS

Program Studi Teknik Sipil

Fakultas Teknik dan Informatika

Universitas PGRI Semarang