ANALISIS FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG AGRARIA DAN TATA RUANG BADAN PERTANAHAN BOJONEGORO TAHAP II
Abstract
Keywords
Full Text:
PDFReferences
Fahrul, Mokoagow, N., Maulana, R., Oggi, Adrian, H., Sely, & Sari, N. (2024). ANALISA PENERAPAN MANAJEMEN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG UNIT PELAYANAN TEKNIS PUSAT BALAI LATIHAN KERJA BANTUL. 3(1), 88–97. https://doi.org/10.55123
Lia Amelia Megawati, L. (2020). ANALISIS FAKTOR KETERLAMBATAN PROYEK KONSTRUKSI BANGUNAN GEDUNG.
Mardiana, A., Sultan, I., Gorontalo, A., Habu, A. J., & Kunci, K. (2020). PENGARUH PEMBANGUNAN INFRASTRUKTUR TERHADAP PERTUMBUHAN EKONOMI KABUPATEN GORONTALO UTARA. In Jurnal Ekonomi Syariah IAIN Sultan Amai Gorontalo) (Vol. 1, Issue 1).
Pane, A., Latief, Y., & Riantini, L. S. (2022). Estimate Activity Duration with Resource Capacity Approach in Project Production Phase, Case Study: Pump Packaging Production System. 222, 355–366. https://doi.org/10.2991/978-94-6463-134-0_35
Qomariyah, S., & Hamzah, F. (2013). ANALISIS NETWORK PLANNING DENGAN CPM (CRITICAL PATH METHOD) DALAM RANGKA EFISIENSI WAKTU DAN BIAYA PROYEK.
Ramadhan Yundra Saputra. (2017). Analisa Faktor Penyebab Keterlambatan Penyelesaian Proyek Pembangunan Mall ABC.
Tania Edna Bhakty, S. E. S. N. C. K. S. (2018). RANCANG BANGUN TEKNIK SIPIL. Program Studi Teknik Sipil Fakultas Teknik Universitas Janabadra.
Wendi Boy, R. E. R. A. F. (2021). Jurnal RIVET (Riset dan Invensi Teknologi) FAKTOR- FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG KULIAH PADA MASA PANDEMI COVID 19. In Universitas Dharma Andalas (Vol. 01, Issue 1).
DOI: https://doi.org/10.26877/giratory.v7i1.28131
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Teknik Sipil Giratory UPGRIS
Program Studi Teknik Sipil
Fakultas Teknik dan Informatika
Universitas PGRI Semarang