| Issue | Title | |
| Vol 4, No 2 (2023) | Correlation of Soil Density Test with Direct Shear Test on Soil Mixture of Ex Kudus Ring Road and Sand at Guamanik Beach, Jepara | Abstract PDF |
| Arba Maris Syaqiba, Slamet Budirahardjo, Ibnu Toto Husodo | ||
| Vol 6, No 1 (2025) | Cost and Time Control Analysis in the Neucentrix Building Renovation Project Using the Earned Value Method | Abstract PDF |
| Putri Pinuji, Putri Anggi Permata Suwandi, Mohammad Debby Rizani | ||
| Vol 5, No 2 (2024) | Cost Performance Evaluation of The Improvement of The Wirosari-Karangasem Road Section, Wirosari District Uses Method (Earned Value Concept) | Abstract PDF |
| Arie Kris Irawan, Putri Anggi Permata Suwandi, Agung Kristiawan | ||
| Vol 2, No 1 (2021) | Decreasing Level Of Total Suspanded Solid (TSS) And Nitrate In Alcohol Traditional Wastewater Using Multi Soil Layering Electrolysis (MSLE) Method | Abstract PDF |
| Nanda Pratiwi Mahardika, Siti Fatimah | ||
| Vol 1, No 1 (2020) | Design approach for Revitalization of The Cultural Heritage Johar Market Area | Abstract 0200107 |
| Ratri Septina Saraswati | ||
| Vol 3, No 2 (2022) | DESIGN OF CONCRETE RETAINING WALL WITH BORED PILE REINFORCEMENT FOR LANDSLIDE MANAGEMENT | Abstract PDF |
| Reki Arbianto, Maria A Kartawidjaya, Melisa Mulyadi | ||
| Vol 1, No 2 (2020) | Design of Concrete Sheet Pile Revetment As A River Protector And Recreation Facilities | Abstract PDF |
| Reki Arbianto, Gunarso Gunarso, Kukuh Kurniawan Dwi Sungkono | ||
| Vol 5, No 1 (2024) | Design of WWTP Anaerobic System at Tempe Factory | Abstract PDF |
| YOGA LESTIYANTO JAMANTO, Yossi Dewi Anggraini, Mohammad Debby Rizani, Ikhwanudin Ikhwanudin | ||
| Vol 3, No 1 (2022) | Evaluation of the Top Structure at PT. Sam Kyung Jaya Busana Factory Building Based on P-M-M Ratio Capacity Value | Abstract PDF PDF |
| Rasyiid Lathiif Amhudo | ||
| Vol 4, No 1 (2023) | FACTORS AFFECTING DELAYS IN THE CONSTRUCTION PROJECT OF 5 FLOOR PARKING BUILDING ROEMANI HOSPITAL, SEMARANG. | Abstract PDF |
| agra febyola lova nugraha, Busyro Lathif, Putri Anggi Permata Suwandi, Ibnu Toto Husodo | ||
| Vol 5, No 1 (2024) | Factors Influencing the Management of Penggaron Terminal Facilities Based On Importance Performance Analysis (IPA) Method Results | Abstract PDF |
| Ahmad Akbar Navis, Mohammad Debby Rizani, Farida Yudaningrum | ||
| Vol 1, No 2 (2020) | Four Floor Building Fragility Analysis With Consideration of The Masonry Infilled Wall Contribution | Abstract pdf |
| Isyana Ratna Hapsari | ||
| Vol 4, No 1 (2023) | GLASS CLEANING WORK PRODUCTIVITY ANALYSISBUILDING USING ROPE ACCESS METHOD (CASE STUDY GLASS CLEANING OF SEMARANG STATE UNIVERSITY HOUSE OF SCIENCE BUILDING) | Abstract PDF |
| Putri Anggi Permata Suwandi, Asy Syakur | ||
| Vol 5, No 2 (2024) | Identification of Shallow Foundation In Swampland Banjarmasin | Abstract PDF |
| Nursyarif Agusniansyah, Gusti Novi Sarbini | ||
| Vol 3, No 2 (2022) | Implementation of Building Information Modelling (BIM 3D) on the Steel Building project: Case study of the 3-storey building GKJ MARGOYUDAN | Abstract PDF |
| Kukuh Kurniawan Dwi Sungkono, Ronald Sukwadi | ||
| Vol 6, No 1 (2025) | Mitigating Workplace Accident Risks through Job Safety Analysis (JSA) in the Reconstruction of Post-Earthquake Buildings in Cianjur Regency | Abstract PDF |
| Johan Christian | ||
| Vol 2, No 1 (2021) | Planning Weir Jeruk Gulung In Troso Village, Pecangaan district, Jepara Regency | Abstract PDF |
| Ikhwanudin Ikhwanudin | ||
| Vol 4, No 2 (2023) | PONCOL SEMARANG STATION PARKING CAPACITY ANALYSIS | Abstract PDF |
| Ifana Masykuroh, Mohammad Debby Rizani, Farida Yudaningrum | ||
| Vol 3, No 1 (2022) | REWORK COST ANALYSIS ON COLUMN WORK IMPLEMENTATION METHODS “CASE STUDY: CONSTRUCTION PROJECT OF HOSPITAL ROEMANI MUHAMMADIYAH PARKING BUILDING SEMARANG†| Abstract PDF PDF |
| Muhamad Suep, Ibnu Toto Husodo, Putri Anggi Permata Suwandi, Agung Kristiawan | ||
| Vol 3, No 2 (2022) | Risk Management Analysis of Construction Projects on Time Performance | Abstract PDF |
| Muhammad Ma'ruf Al Matin, Annisa Azhar Firdausi, Hendramawat Aski Safarizki | ||
| Vol 1, No 1 (2020) | Significant Value of Construction Waste Management Variable Using Structural Equation Model | Abstract 0200101 |
| Elizar Elizar | ||
| Vol 1, No 2 (2020) | THE APPLICATION OF VALUE ENGINEERING IN SOIL IMPROVEMENT (PROJECT OF PELINDO III TELUK LAMONG SURABAYA) | Abstract PDF |
| Wendi Boy, Muhammad Agung Wibowo, Miftahul Huda | ||
| Vol 2, No 1 (2021) | The Effect of Admixture on Mortar in 3D Printing Technology | Abstract PDF |
| Retnowati Setioningsih | ||
| Vol 5, No 1 (2024) | The Effect of Health Safety Environment (HSE) on The Productivity of Construction Workers in Wall and Plaster Work at DC MUI BOYOLALI | Abstract PDF |
| Muhammad Reza Arahman, Ibnu Toto Husodo, Putri Anggi Permata Suwandi, Didik Purnomo | ||
| Vol 4, No 1 (2023) | The Effectiveness of Substitution Fine Aggregate by Pacitan Coral Sand to the Compressive Strength of Concrete | Abstract PDF |
| Rida Handiana Devi, Hendramawat Aski Safarizki, Imam Prasetyo Azhari Putra, Marwahyudi Marwahyudi | ||
| 26 - 50 of 53 Items | << < 1 2 3 > >> | |












