| Issue | Title | |
| Vol 3, No 1 (2022) | ANALYSIS OF VEHICLE OPERATING COSTS USING METHOD (PACIFIC CONSULTANT INTERNATIONAL) PCI ON SEMARANG TOLL ROAD SECTION A AND NON-TOLL ROAD (KRAPYAK-JATINGALEH) | Details PDF PDF PDF |
| Rega Mahendra, Veni Asih, Putri Anggi Permata Suwandi, Farida Yudaningrum | ||
| Vol 5, No 1 (2024) | ANALYZE THE VARIABILITY OF CONCRETE QUALITY IN THE WORK ON THE PROMENADE APARTMENT USING SPC STATISTICAL PROCCES CONTROL Case Study: Queen City Mall Building Project Hotel and Apartment Promenade | Abstract PDF |
| Dwi Achmad Fauzi, Jannah Rahmah Alfafa, Putri Anggi Permata Suwandi, Agung Kristiawan | ||
| Vol 1, No 1 (2020) | Banger Retention Pool As Alternative Control Flood | Abstract 0200106 |
| Farida Yudaningrum, Ikhwanudin Ikhwanudin | ||
| Vol 5, No 2 (2024) | COMPARATIVE ANALYSIS OF PRECAST HALF SLAB COST BUDGET PLANS WITH CONVENTIONAL CONCRETE PLATES | Abstract PDF |
| M Firoos Hizballah, Putri Anggi Permata Suwandi, Mohammad Debby Rizani | ||
| Vol 7, No 1 (2026) | Comparative Analysis Of Vehicle Operating Cost BOK Using the Pacific Consultant International PCI Method On The Kaliwungu – Krapyak Toll Road and NonTol Road | Abstract PDF |
| Larasati Welas Yuliasih, Putri Ameliya Sari, Agustina Wardani, Farida Yudaningrum | ||
| Vol 7, No 1 (2026) | Comparison of Cut and Fill Volume Calculation Using Building Information Modeling BIM and Conventional Methods Cut and Fill Project of KIT Batang Block A Lots 9 10 11 12 and 12A | Abstract PDF |
| FERDY YOLA RAMADHONY, MAY KRISTINA WIDYANINGSIH, IKHWANUDIN IKHWANUDIN, PUTRI ANGGI PERMATA SUWANDI | ||
| Vol 7, No 1 (2026) | Compound Coastal Flood Risk and Infrastructure Loss Estimation in Bengkulu City, Indonesia, under Sea-Level Rise Using Google Earth Engine and OpenStreetMap | Abstract PDF |
| Aidil Fitriansyah, Muharram Nur Fikri | ||
| Vol 1, No 1 (2020) | Concrete Compressive Strength Study with Anadara granosa Shell Waste as a Replacement for Part of Cement | Details 0200105 |
| Hendramawat Aski Safarizki | ||
| Vol 4, No 2 (2023) | Correlation of Soil Density Test with Direct Shear Test on Soil Mixture of Ex Kudus Ring Road and Sand at Guamanik Beach Jepara | Abstract PDF |
| Arba Maris Syaqiba, Slamet Budirahardjo, Ibnu Toto Husodo | ||
| Vol 6, No 1 (2025) | Cost and Time Control Analysis in the Neucentrix Building Renovation Project Using the Earned Value Method | Abstract PDF |
| Putri Pinuji, Putri Anggi Permata Suwandi, Mohammad Debby Rizani | ||
| Vol 7, No 1 (2026) | COST EFFICIENCY ANALYSIS AND RISK MANAGEMENT OF THE SELFMANAGED BATCHING PLANT METHOD MUSI TOLL KAYU AGUNGPALEMBANGBETUNG BRIDGE PROJECT | Abstract PDF |
| Joko Supriyono, Agung Kristiawan, Vicha Silviana Ramadhani, Putri Anggi Permata Suwandi | ||
| Vol 5, No 2 (2024) | Cost Performance Evaluation of The Improvement of The WirosariKarangasem Road Section Wirosari District Uses Method Earned Value Concept | Abstract PDF |
| Arie Kris Irawan, Putri Anggi Permata Suwandi, Agung Kristiawan | ||
| Vol 2, No 1 (2021) | Decreasing Level Of Total Suspanded Solid (TSS) And Nitrate In Alcohol Traditional Wastewater Using Multi Soil Layering Electrolysis (MSLE) Method | Details PDF |
| Nanda Pratiwi Mahardika, Siti Fatimah | ||
| Vol 1, No 1 (2020) | Design approach for Revitalization of The Cultural Heritage Johar Market Area | Abstract 0200107 |
| Ratri Septina Saraswati | ||
| Vol 3, No 2 (2022) | DESIGN OF CONCRETE RETAINING WALL WITH BORED PILE REINFORCEMENT FOR LANDSLIDE MANAGEMENT | Abstract PDF |
| Reki Arbianto, Maria A Kartawidjaya, Melisa Mulyadi | ||
| Vol 1, No 2 (2020) | Design of Concrete Sheet Pile Revetment As A River Protector And Recreation Facilities | Details PDF |
| Reki Arbianto, Gunarso Gunarso, Kukuh Kurniawan Dwi Sungkono | ||
| Vol 5, No 1 (2024) | Design of WWTP Anaerobic System at Tempe Factory | Abstract PDF |
| YOGA LESTIYANTO JAMANTO, Yossi Dewi Anggraini, Mohammad Debby Rizani, Ikhwanudin Ikhwanudin | ||
| Vol 7, No 1 (2026) | Evaluation of Road Preservation Priorities Based on Road Condition and Traffic Load on the Jambi Province BorderMaur Project Corridor | Abstract PDF |
| Kimgrace Martha Putri Pratiwi, Dewi Handayani, Widi Hartono | ||
| Vol 3, No 1 (2022) | Evaluation of the Top Structure at PT. Sam Kyung Jaya Busana Factory Building Based on P-M-M Ratio Capacity Value | Abstract PDF PDF |
| Rasyiid Lathiif Amhudo | ||
| Vol 4, No 1 (2023) | FACTORS AFFECTING DELAYS IN THE CONSTRUCTION PROJECT OF 5 FLOOR PARKING BUILDING ROEMANI HOSPITAL SEMARANG | Abstract PDF |
| agra febyola lova nugraha, Busyro Lathif, Putri Anggi Permata Suwandi, Ibnu Toto Husodo | ||
| Vol 5, No 1 (2024) | Factors Influencing the Management of Penggaron Terminal Facilities Based On Importance Performance Analysis IPA Method Results | Abstract PDF |
| Ahmad Akbar Navis, Mohammad Debby Rizani, Farida Yudaningrum | ||
| Vol 1, No 2 (2020) | Four Floor Building Fragility Analysis With Consideration of The Masonry Infilled Wall Contribution | Details pdf |
| Isyana Ratna Hapsari | ||
| Vol 4, No 1 (2023) | GLASS CLEANING WORK PRODUCTIVITY ANALYSISBUILDING USING ROPE ACCESS METHOD CASE STUDY GLASS CLEANING OF SEMARANG STATE UNIVERSITY HOUSE OF SCIENCE BUILDING | Abstract PDF |
| Putri Anggi Permata Suwandi, Asy Syakur | ||
| Vol 5, No 2 (2024) | Identification of Shallow Foundation In Swampland Banjarmasin | Abstract PDF |
| Nursyarif Agusniansyah, Gusti Novi Sarbini | ||
| Vol 3, No 2 (2022) | Implementation of Building Information Modelling (BIM 3D) on the Steel Building project: Case study of the 3-storey building GKJ MARGOYUDAN | Abstract PDF |
| Kukuh Kurniawan Dwi Sungkono, Ronald Sukwadi | ||
| 26 - 50 of 68 Items | << < 1 2 3 > >> | |